News
Ghana fully funded evacuation of nationals from South Africa- Foreign Affairs Ministry

- /home/u249204778/domains/spectator.com.gh/public_html/wp-content/plugins/mvp-social-buttons/mvp-social-buttons.php on line 27
https://spectator.com.gh/wp-content/uploads/2026/08/WhatsApp-Image-2026-08-13-at-13.30.41.jpeg&description=Ghana fully funded evacuation of nationals from South Africa- Foreign Affairs Ministry', 'pinterestShare', 'width=750,height=350'); return false;" title="Pin This Post">
- Share
- Tweet /home/u249204778/domains/spectator.com.gh/public_html/wp-content/plugins/mvp-social-buttons/mvp-social-buttons.php on line 72
https://spectator.com.gh/wp-content/uploads/2026/08/WhatsApp-Image-2026-08-13-at-13.30.41.jpeg&description=Ghana fully funded evacuation of nationals from South Africa- Foreign Affairs Ministry', 'pinterestShare', 'width=750,height=350'); return false;" title="Pin This Post">
The Government of Ghana has stated that it fully funded the evacuation of more than 1,600 Ghanaians from South Africa following recent xenophobic attacks.
The Ministry of Foreign Affairs, in a statement issued on Thursday, August 13, 2026, said Ghana did not seek financial or material support from the South African Government to bring the affected Ghanaians back home.
The Ministry was responding to media reports that South Africa was seeking about $18 million in reimbursement from some African countries for costs incurred in supporting and evacuating their nationals.
It explained that all costs related to the evacuation of Ghanaians were covered by the Government of Ghana and Ghanaian partners.
According to the Ministry, more than 1,600 Ghanaians have been evacuated from South Africa since May 2026, with the exercise still ongoing.
It said the evacuees are also provided with reintegration funds, transport fares and other relief items after arriving in Ghana to help them settle back into the country.
The Ministry assured Ghanaians that the country would not be included among those being asked by South Africa to reimburse the cost of repatriating foreign nationals.
It reaffirmed the government’s commitment to protecting the lives and welfare of Ghanaians living abroad.
The Ministry said the government would continue to take timely action whenever the safety and security of Ghanaians outside the country were at risk.
It expressed gratitude to President John Mahama and Ghanaian partners for supporting the fully Ghanaian-funded evacuation exercise.
By: Jacob Aggrey
News
Ghana deepens ties with Barbados – Ambassador Baba Sadiq

Ghana’s High Commissioner to Nigeria, Baba Sadiq, has held talks with the High Commissioner of Barbados to Ghana, H.E. Juliette Bynoe-Sutherland, at the Ghana High Commission in Abuja.
The meeting, according to the Ambassador, builds on the growing momentum in Ghana–Barbados relations, including the recent participation of Barbadian Prime Minister, Mia Amor Mottley, in high-level engagements in Ghana.
The two diplomats discussed strengthening cooperation in key areas including aviation and connectivity, tourism, trade and investment, education, culture, migration and security, reparations and multilateral affairs.
Ambassador Baba Sadiq noted that Ghana and Barbados share deep historical and cultural bonds, adding that the focus now is to translate that shared heritage into practical partnerships that connect people, unlock opportunities and strengthen Africa–Caribbean relations.
By Edem Mensah-Tsotorme
News
A Plus leads AKA Energy delegation to Presidency over 270MW solar project

Member of Parliament for Gomoa Central, Kwame Asare Obeng, popularly known as A Plus, has announced plans for the construction of a 270-megawatt solar energy project to power the Gomoa Special Economic Zone and the Gomoa Eco Park.
According to the MP, a delegation from AKA Energy Systems, led by its Chief Executive Officer, met with President John Dramani Mahama earlier yesterday, September 8, to formally inform him that preparations towards the project have commenced.
In a post, A Plus, who led the delegation to the Presidency, disclosed that the project will be a major power source for the manufacturing, industrial and commercial hub.
He stated that the project will be developed in phases, with Phase One expected to be completed by the end of 2027.
By Edem Mensah-Tsotorme
News1 week agoPolice arrest six suspected members of armed robbery syndicate in Ashanti Region
News6 days agoOSP probes alleged GH¢70,000 vetting cash linked to Patricia Appiagyei; Minority says memo is fake
News6 days agoAshanti Region crowned 2026 MTN Elite U-19 Champions after seven-goal thriller








